Build: #8 was successful
Job: Pipeline PR Test 6.6.1 was successful
validate date method: Test case result
The below summarizes the result of the test " validate date method" in build 8 of Pipeline - Pipeline Pull Request Test - PIPE-1969-update-pipeline-task-cli-docstrings-to-a-standard-format - Pipeline PR Test 6.6.1.
- Description
- validate date method
- Test class
- pipeline.infrastructure.utils.casa_data_test
- Method
- test_validate_date_method
- Duration
- < 1 sec
- Status
- Successful