Build: #8 was successful
Job: Pipeline PR Test 6.6.1 was successful
test: Test case result
The below summarizes the result of the test "test" in build 8 of Pipeline - Pipeline Pull Request Test - PIPE-1969-update-pipeline-task-cli-docstrings-to-a-standard-format - Pipeline PR Test 6.6.1.
- Description
- test
- Test class
- pipeline.h.tasks.common.atmutil_test
- Method
- test
- Duration
- 15 secs
- Status
- Successful