Build: #18 was successful
Job: Pipeline PR Test 6.6.1 was successful
to topo[214.5.0~215.5Ghz;215.6~216.1Ghz LSRk-msnames0-fields0-0-observing run0-result0]: Test case result
The below summarizes the result of the test " to topo[214.5.0~215.5Ghz;215.6~216.1Ghz LSRk-msnames0-fields0-0-observing run0-result0]" in build 18 of Pipeline - Pipeline Pull Request Test - PIPE-2001-selfcal-pl2024-mosaic-heuristics - Pipeline PR Test 6.6.1.
- Description
- to topo[214.5.0~215.5Ghz;215.6~216.1Ghz LSRk-msnames0-fields0-0-observing run0-result0]
- Test class
- pipeline.infrastructure.contfilehandler_test
- Method
- test_to_topo[214.5.0~215.5GHz;215.6~216.1GHz LSRK-msnames0-fields0-0-observing_run0-result0]
- Duration
- < 1 sec
- Status
- Successful