Build: #11 was successful
Job: Pipeline PR Test 6.6.6 was successful
parallel with custom nproc: Test case result
The below summarizes the result of the test " parallel with custom nproc" in build 11 of Pipeline - Pipeline Pull Request Test - pclean - Pipeline PR Test 6.6.6.
- Description
- parallel with custom nproc
- Test class
- pipeline.infrastructure.utils.pclean_test.TestPcleanWithValidDataset
- Method
- test_parallel_with_custom_nproc
- Duration
- 32 secs
- Status
- Successful