Build: #6 was successful

Job: Pipeline PR Test 6.6.6 was successful

Stages & jobs

  1. Default Stage

date message type: Test case result

The below summarizes the result of the test " date message type" in build 6 of Pipeline - Pipeline Pull Request Test - PIPE-1263-replace-existing-recipe-scripts-with-auto-generated-ones - Pipeline PR Test 6.6.6.
Description
date message type
Test class
pipeline.infrastructure.utils.casa_data_test
Method
test_date_message_type
Duration
< 1 sec
Status
Successful