Build: #5 was successful
Job: Test Many Linux 2.28 was successful
round half up[-2.1-0--2]: Test case result
The below summarizes the result of the test " round half up[-2.1-0--2]" in build 5 of Pipeline - Pipeline 2024.1.1 with Casa 6.6.1 test - cvpost - release-6.6.1 - Test Many Linux 2.28.
- Description
- round half up[-2.1-0--2]
- Test class
- pipeline.infrastructure.utils.math_test
- Method
- test_round_half_up[-2.1-0--2]
- Duration
- < 1 sec
- Status
- Successful